Другие журналы

. A B C D E F G H I J K L M N O P R S T U V W Y Z К М С Т

Kolosov


# 07, July 2012
T he paper presents results of optimization of the closed Brayton cycle gas turbine power plant with capacity of 10 kw with an electric heater as a heat source. The results of calculations assemblies and units included in the model sample the closed two loops gas turbine power plant. Analysis was carried out design and arrangement solution necessary for the optimal location in the model sample of the limited dimensions of the room. Various options are configuration solutions.
Study of possibility of creating a 10kW two-loop closed gas turbine power plant
Engineering Education # 07, July 2012
DOI: 10.7463/0712.0432244
This paper presents the results of optimization of a closed Brayton cycle gas turbine power plant with capacity of 10 kW with an electric heater as a heat source. The authors present the results of calculations of assemblies and units included in the model sample of the closed two-loop gas turbine power plant. Analysis of design and arrangement solution required for optimal location of the model sample in the limited dimensions of the room was carried out. Various configuration solutions are also included in the article.
 
SEARCH
 
elibrary crossref ulrichsweb neicon rusycon
Photos
 
Events
 
News



Authors
Press-releases
Library
Conferences
About Project
Rambler's Top100
Phone: +7 (915) 336-07-65 (строго: среда; пятница c 11-00 до 17-00)
  RSS
© 2003-2024 «Наука и образование»
Перепечатка материалов журнала без согласования с редакцией запрещена
 Phone: +7 (915) 336-07-65 (строго: среда; пятница c 11-00 до 17-00)