Другие журналы

. A B C D E F G H I J K L M N O P R S T U V W Y Z К М С Т

Biryukov

Binary steam turbine power plant with capacity 27,5 mw for geothermal source of energy
# 06, June 2012
The object of this study is a binary steam turbine power plant. Purpose of work is the design of binary steam turbine geothermal power plant for future development of geothermal fields, which able to make better use of geothermal resources in comparison with the existing steam turbine plant on geothermal energy sources
Geothermal power plants steam turbine with binary cycle for geothermal fields of kamchatka
Engineering Education # 09, September 2011
The object of this study is a geothermal steam turbine plant with binary cycle. Purpose of work – design of steam turbine geothermal binary cycle power plant for future development of geothermal fields which able to make better use of geothermal resources in comparison with the existing steam turbine plant on geothermal energy sources. The state of the existing geothermal power plants is presented an estimate of the thermal characteristics of promising geothermal fields of the Kamchatka region, is given. As a result of this investigation the concrete geothermal field is chosen, and the design of steam turbine plant with capacity of 25 MW is fulfilled.
 
SEARCH
 
elibrary crossref ulrichsweb neicon rusycon
Photos
 
Events
 
News



Authors
Press-releases
Library
Conferences
About Project
Rambler's Top100
Phone: +7 (915) 336-07-65 (строго: среда; пятница c 11-00 до 17-00)
  RSS
© 2003-2024 «Наука и образование»
Перепечатка материалов журнала без согласования с редакцией запрещена
 Phone: +7 (915) 336-07-65 (строго: среда; пятница c 11-00 до 17-00)